HOMEMARKETSHEALTHCARE – BAPTIST HOSPITAL EAST
 
 
 
 
 
 
 
Greenville Hospital System University Medical Center — Greer Memorial Hospital Replacement Facility and Central Energy Plant
Cedar Park Regional Medical Center
Baptist Hospital East — Outpatient Surgery and Patient Tower Addition
Carolinas Medical Center — Pineville Expansion and Renovation Program
 
 
 
 
 

The BE&K Building Group is providing preconstruction and construction services for this  outpatient surgery and patient tower addition that is expected to be complete by September 2008.

New construction consists of deep foundations (caissons), structural steel framing, normal weight concrete slab on metal deck, precast and curtainwall skin, and a built-up roof over lightweight insulating concrete.

The first floor construction includes mechanical room space, administrative areas, and covered parking accommodating 65 spaces.  The second floor includes eight operating rooms, with 24 prep and recovery rooms and an eight-bed post anesthesia care unit (PACU).  Floors three through eight house patient beds, with 24 private rooms per floor and areas dedicated to oncology, orthopedics, neurology and medical/surgical. The remaining areas of the first three floors provide other support services.


Baptist Hospital East
Outpatient Surgery
and Patient Tower Addition
Louisville, Kentucky
 
Project Location Louisville, Kentucky
Construction Value

$74 million

Building Size

290,000 sf

Completion

2008

Assignment

Construction Management at Risk

Client

Baptist Healthcare System

Architect

Engberg Anderson Design Partnership, Inc.



Back To Top

© 2008 BE&K Building Group. A KBR Company. All rights reserved.   Privacy Policy   Legal Statement